Amana PGD**C Bedienerhandbuch Seite 8

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 12
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 7
8
Condensing & Non-Condensing Furnaces
1. Reinstall gas manifold and valve.
2. Reconnect wiring (and burner box hose on GUD and
GCD furnaces) to gas valve. Secure wiring to mani-
fold using wire ties provided. Ensure wiring does not
interfere with orifices or burners.
Package Gas-Electric
PACKAGE GAS-ELECTRIC UNITS EQUIPPED WITH PI-
LOT
1. Reinstall gas manifold and valve.
2. Secure the pilot assembly to the burner tray.
3. Reconnect wiring to gas valve. Secure wiring to
manifold using wire ties provided. Ensure wiring
does not interfere with orifices or burners.
PACKAGE GAS-ELECTRIC UNITS WITHOUT PILOT
1. Reinstall gas manifold and valve.
2. Reconnect wiring to gas valve. Secure wiring to
manifold using wire ties provided. Ensure wiring
does not interfere with orifices or burners.
Manifold Reinstallation
CAUTION
Pilot assembly must be properly aligned
with burners for proper ignition. Refer to
Figure 11.
"A"
CORRECT
POSITION
DIMENSION
"A" CANNOT
EXCEED 1/4"
Figure 11
Pilot Assembly Positioning
Seitenansicht 7
1 2 3 4 5 6 7 8 9 10 11 12

Kommentare zu diesen Handbüchern

Keine Kommentare